Route 34 in New Haven was originally planned in the 1940s to serve as a connection through the Lower Naugatuck Valley. The process of aquiring the necessary land began In the 1950's and resulted in 880 displaced families, 350 demolished buildings, and cutting off the downtown area from several neighborhoods, Union Station, and Yale School of Medicine. The Connector reduced the connectivity of the neighborhood street network and damaged the economic vitality of nearby businesses. The original plan was to extend the road an additional 10 miles, but that long section faced neighborhood opposition and was never constructed. Work on the route ended in the 1970's before its full completion, resulting in many people ironically referring to it with its original nickname: the Oak Street Connector.

Route 34 begins at the junction of Interstates 95 and 91 and extends into downtown New Haven for 1.1 miles before dropping below grade at College Street and continuing as a pair of one-way streets.  Route 34 carries 73,900 vehicles on the route per day. The Connector, occupies 26 acres of land between downtown and the adjacent neighborhood.

New Haven Route 34 constructionNew Haven Route 34 construction
881 households and 350 businesses demolished to build I-34. Source: Downtown Crossing New Haven

In 2002, the State of Connecticut sold the land that had been set aside for the extension of the Oak Street Connector. In 2005, with the completion of Pfizer Pharmaceutical's research facility in the former planned right-of-way, the City of New Haven and local civic groups began calling for the replacement of the Oak Street Connector with a four-lane boulevard. A concept plan identified ten acres of vacant land to redevelop and two street connections to restore, along with a larger surrounding area to be revitalized. New Haven's Mayor, John DeStefano, Jr. included the removal of the Connector in Future Framework 2008 as an urban infill strategy. The Tri-State Transportation Campaign and the Urban Design League of New Haven are actively campaigning for the replacement of the depressed and paired one-way sections of Route 34 with walkable, pedestrian-friendly streets and blocks.

In early 2010, Mayor DeStefano announced the initial phases of the removal of Route 34  starting with 100 College Street, in his address to the City. New Haven was awarded a TIGER II grant with the Connecticut Department of Transportation (CONNDOT) to prepare an Environmental Impact Statement (EIS). Controversy continues over the scale of the new surface street. Residents and activists have pushed for greater pedestrian safeguards and to reduce the number of lanes in the current Downtown Crossing plan. 

New Haven route 34 boulevard
Project Proposal to convert highway stub to two city streets with new development parcels. Source: Downtown Crossing New Haven

The plan to replace Route 34 is called Downtown Crossing and aims to develop a livable, walkable community while providing local and regional connectivity. Its goal is to reclaim 10 acres of land for residential, retail and health care facilities development and create a series of new city streets and boulevards through three phases.

The project is well into Phase 1 of its completion. Exit 3 has been permanently closed, and construction for a new med/lab building for Alexion Pharmaceuticals is underway with expectations to be completed in 2015. Phase 2 includes Orange St being reconnected between the Ninth Squre District and Union Station, and additionally see the development of the Coliseum site. Phase 3 will see the completion of the two main boulevards, MLK Boulevard and South Frontage Road and their connections.

New Haven route 34 boulevard
Route 34 in New Haven with large parking garage today. Source: Freeways Without Futures

For more information on how to get involved or to keep track of the progress of the project, please visit Downtown Crossing.

Similar Projects


I-35

Austin, Texas

Before the highway boom of the 1950s and 60s, a quiet tree-lined boulevard named East Avenue marked the eastern boundary of a connected downtown grid, and existed in the footprint of what is now Interstate 35 (I-35).


Manzanares River Banks

Madrid, Spain

More information coming soon.


I-490 Inner Loop

Rochester, New York

In the early 1950s, when construction began on Rochester's Inner Loop Highway, the city's population was about 330,000.