Bonaventure Expressway transformation

Montreal, Quebec

Montreal began ripping down the Bonaventure Expressway in July 2016, 50 years after the 11 lane roadway was built. The promise to replace the highway received wide support, including the blessing of Montreal Mayor Denis Coderre. The highway will be replaced with two urban boulevards, at an expected cost of $142 million. The project was scheduled to be finished September 2017.

Similar Projects


Sheridan Expressway

South Bronx, New York

Built in 1963, the Arthur V.


Octavia Boulevard

San Francisco, California

San Francisco’s Central Freeway was one of two freeways to see their demise after the 1989 Loma Prieta earthquake.


Embarcadero Freeway removal

San Francisco, California

San Francisco's Embarcadero Freeway was originally designed to connect the Bay Bridge and the Golden Gate Bridge but was never completed.